European Single Procurement Document ESPD
[edit] Introduction
The European Single Procurement Document (ESPD) is a self-declaratory document used by both buyers and suppliers on public-sector contracts anywhere within the European Union. It is intended to remove some of the barriers faced by suppliers (particularly small- and medium-sized enterprises (SMEs)) when tendering for goods, services or works on public-sector contracts.
The ESPD is typically issued by public-sector bodies (buyers of goods and services) to get suppliers (bidders) to respond to, or register their interest in, bidding. ESPD helps to simplify the procurement process for both sides.
Introduced in April 2016 and created under the EU 2014 Directive on Procurement, ESPD is an alternative to the more complex selection questionnaire. The self-regulatory nature of the ESPD allows suppliers to self-declare that they meet the minimum regulatory criteria or commercial capability requirements, and so allows them to progress to the next stage of the process.
In submitting an ESPD, the supplier is providing a preliminary indication that their ability, suitability and financial status meet the stated conditions of the procurement process.
This means they do not have to provide up-front documentary evidence and the assorted paperwork previously required to show they meet the public authority’s required criteria; they only have to provide such evidence when or if they are selected as the appointed contractor.
[edit] The process
The ESPD process can be summarised as follows:
- The buyer states their selection and exclusion criteria in their contract notice, including minimum standards and their policy on short-listing.
- The buyer issues the ESPD request to attract anyone interested in bidding for the contract.
- Bidders (suppliers) complete and submit their ESPD response to the buyer.
- The buyer evaluates the supplier responses for suitability against the stated criteria.
- Where bidders are found subsequently not to meet the minimum requirements, or are in breach of one of the requirements, they are excluded from the bidding process.
- ESPD is completed online, and is free.
- Although bidders have to complete an ESPD for every project, the standard ESPD form used across Europe means they can re-use a form submitted on a previous bid, as long as the information is still current.
See also: ESPD and the decline of the PQQ
As of December 2020, the ESPD has changed in England to the Single Procurement Document (SPD); in Scotland, it is SPD (Scotland).
See also: Single Procurement Document (Scotland).
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Common minimum standards.
- ESPD and the decline of the PQQ.
- Fair payment practices.
- Managing the procurement process.
- Most Economically Advantageous Tender (MEAT).
- OJEU.
- Procurement route.
- Public body.
- Public contract.
- Public project definition.
- Public sector.
- Publicly subsidised project.
- Single Procurement Document (Scotland).
- SMEs and government contracts.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.